PART ONE
 
Purpose, Scope , Basis and Definitions
purpose
ARTICLE 1 - ( 1) The purpose of this regulation , the sea and inland waterway navigation, life , property and environmental safety for the supply of ships and vessels should have documentation of the technical qualifications and competencies and build , refurbishment and maintenance and inspections carried out during repairs to the Administration , facility with the owner, the owner or his representative to determine the principles and procedures to be followed .
 
scope
ARTICLE 2 - ( 1) The provisions of this Regulation , the full height of 15 meters and 15 meters in length or a little longer and not as a result of renovations , the full height of 15 meters , regardless of the length of the ship and the water with more than 12 passenger-carrying vehicles or passenger capacity of 12 persons and capacity building , and the passenger capacity of less than 12 persons, the ship and water vehicles , or unclassified classed as free trade zones in the country , or to be built or modified , or the Turkish flag Turkish flag or do maintenance and repairs include those that may be .
( 2) In this Regulation , unless otherwise indicated for a foreign flag , the ship and the water in the country with the tools built in or free zones , foreign -flagged and amended in the country or in free zones and water vehicles , the ship does not cover repairs or maintenance .
(3) The provisions of this Regulation apply to military vessels and water vehicles .
 
support
ARTICLE 3 - ( 1) This Regulation No. 491 dated 08.10.1993 the Establishment and Duties of Undersecretariat for Maritime Affairs and 8th on the basis of Article 2 of Decree-Law prepared.
 
Definitions
ARTICLE 4 - ( 1) of this Regulation;
a) Military ship : the armed forces , belonging to the nationality of the vessel with a distinctive outward sign , the name stored in the appropriate service list or any equivalent document , which is managed by an officer appointed by the government of the country under the discipline of the regular army and the ship is equipped with a seaman ,
b) Certification: International and national legislation within the framework of the principles and procedures of any document given to specific ,
c) Sizing: Hair thickness , zip , belt , such as the longitudinal elements can provide the required strength hull structural elements must-have for the calculation of the dimensions ,
d) Regional Office and the harbor authorities : the Administration and on the respective regional offices within the limits defined in this Regulation and the port facilities presidency ,
d) Location: Turkish and foreign -flagged vessels and vehicles maintenance and repair of water and operates wintering plant,
e) Vessel name , tonnage and other referral system to use for whatever purpose you can move in all kinds of paddle boat in the water ,
f) Internal waters: natural and artificial lakes in our country , all of the dam lakes and rivers ,
g) Administration: Undersecretariat of Maritime Affairs ,
g) Classification Society : Naval and water means to be a safe structure with its own unique construction and inspection rules and watercraft expert staff and the owner or by the owner of the ship , ship construction , alteration , maintenance and repair activities for the control referenced by the Administration the foundation of an authorized or recognized ,
h ) Control Engineer: Ship and water vehicles built or renovated ship jobs are built according to the project engineer responsible for the construction of the Chamber of Architects and Marine Engineers ,
i) The final project : build or refurbishment projects prepared during the end of the first applicant if there is a difference , and the ship and the water truck comes to the differences in the perpetration build or refurbishment project which shows the shape of the end of the last ,
i ) Project Engineer: ship construction engineer registered in the Chamber of Marine Engineers ,
j) Water tool: Ship outside , water can float and used in accordance with the purpose has been allocated , and the structure of all types of vehicles ,
k) may be of the Turkish flag ships and water vehicles : the Turkish flag at the end of its construction , and will build the ship and water vehicles ,
l) Remodeling: Ship and water vehicles , or the gross and net tonnage of one of the three main size will occur in at least one structural change,
m) Length overall: Ship and water included in the vehicle fore and aft center line of the ledger is the length between the bow and stern of the outer points of the bass / aft overhangs are not included and the length of the pier ,
n ) Boats made ​​of : The full length of 120 meters and below the means of all kinds of Turkish and foreign -flagged vessels and water construction, alteration , maintenance and repair services that allow for at least one fully equipped facility ,
o) Representative : Ships and watercraft owner or the owner's build , modification , maintenance and repair activities to show respect for the appointed or acting on behalf of the owner's contract signed by the natural or legal person ,
ö ) Shipyard : All kinds of Turkish and foreign -flagged ships and vessels construction , maintenance, repair , and alteration of one or more technical and social infrastructures that allow for shoreline and coastal areas with a plant,
p) Facility : Shipyard , boat building refers to the location of the place and lifting .
 
PART TWO
Built or renovated Permissions and Tracking
Permission to build or refurbishment
ARTICLE 5 - ( 1) This regulation is within the scope of ships and vessels built or Alteration of ships and watercraft to start the Administration the owner or his representative is allowed .
2) Ships and watercraft owner or his representative before the start of construction in the Annex to this Regulation on Annex- 1 Vessel or two copies of the Certificate Application in Water build tool , before starting renovation of the Annex 2 to the ship or water to be present as two copies of the Certificate Application Tool Repair is submitted to the regional directorate of local or port . Applications built with the applicant 's license , Annex 3 Ship or documents mentioned in the documents required to apply for permission to build Water Tool , modification , or water applications in Appendix -4 Ship Repair Tool presents the documents referred to the documents required to apply for permission .
3) Regional Directorate of the changes to be made if deemed necessary by examining the documents , notify the applicant in writing of deficiencies and non-compliances .
4) Regional Directorate of the application , if appropriate , in the Annex to this Regulation is to build , build tool Permit Appendix- 5 Vessel or two copies of the water , Appendix 6 for renovations of the two copies of the ship or Water Permit regulates Repair Tool . Annex-5 Ship or water vehicle that let you build a 2-year Certificate in Appendix -6 Water Tool Repair Ship or the 6-month period of validity of the Certificate of Fitness is . This task is not completed within the time period in the event of regional directorate of ships and watercraft by the owner or his representative or the permissions that are granted to the Port Authority will be resorted to with the petition at the end of the validity period of checks to two years for permission to build a time , modifications may be extended for a maximum of 6 months for permission .
5) All vessels of 500 GT and above , and water utilities and water utilities with the ship carrying more than 12 passengers shall be constructed as classed . Alteration of ships and vessels under no classification is not required for class . Classification of class is required alteration of ships and vessels . Applications for permission to build or refurbishment plans, control
 
ARTICLE 6 - ( 1) in the Annex to this regulation , the ship or water build tool Annex 3 and Annex 4 of the documents required to apply for permission Tool Repair Ship or water are listed in the documents required to apply for permission and the list of projects which are approved and documents signed by the project engineer slots project and the documents must be professionally supervised Chamber of Marine Engineers .
2) Annex 3 are listed in the documents required to apply for permission to build the ship or water vehicle classification society approval for the project and built the required permit documents prepared in the first stage of the final stage of the projects and the projects will be asked to certification . Built during the interim approval is required for changes in classification .
3) Foreign origin, projects and documents , "foreign origin, project " in the form must be approved by the Chamber of Architects and Marine Engineers . Permission to build or refurbishment , which is based on changes in the data
 
ARTICLE 7 - ( 1) the permit changes that occurred after the administration of the information and documents submitted with the application , the control engineer or by the regional directorate of the Port Authority shall be notified within 10 working days from the date of change .
 
Maintenance and Repair
ARTICLE 8 - ( 1) the owner or his representative , GT and over 300 ships and vessels in the Annex to this Regulation for the maintenance and repair activities , Appendix 8 Ship or Water Vehicle Maintenance and Repair Data Sheet provides information on the Regional Directorate or the Port Authority . Or free trade zones in the country , to be built or modified , or maintenance - repairs to foreign flagged vessels and water utilities
 
ARTICLE 9 - ( 1) the property owner or his representative in the country or in free zones , which is longer than the full length or height of 15 meters and more than 12 persons , regardless of foreign flagged ships and vessels carrying passengers and 300 GT and over built and alteration of foreign flagged vessels and water, maintenance and repair of vehicles , Annex -9 of this Regulation or the free zones in the country , human being or to be modified or foreign flagged ships and water Utilities maintenance and Repairs with the regional Directorate or the Port Authority to provide information Notification Form .
2) Export constructed or modified for the owner or his representative of the vessel or watercraft , boat or water vehicle not exported, in case of withdrawal of the Turkish flag , indicating the reasons for not exporting the document is submitted to the Regional Directorate or the Port Authority . This means the ship and water , or on the 500 GT and the ship carrying more than 12 passengers , and water utilities must be built as classed . This ship is classed as a means of water and for those who have to be built , which is attached in Annex 3 of this Regulation on the ship or water vehicle listed in the documents required to apply for permission to build plans and documents are required . Surveys carried out by experts in ship survey , from instrumental to the extent that people will continue to plan and proper documentation . After that, the ship and the water processing instrument made ​​pursuant to the provisions of this Regulation , periodic checks and certification
is computed . The ships and vessels built for export purposes , and as a result of non- exported without the permission of the Turkish flag in case of withdrawal is completed the construction of the ship and the water processing tools are made according to the provisions of Article 18 .
3) is issued for the ship to be registered in the Register for ships under construction , and water utilities ,
As set out in Article 5 must get permission to build . Regional Directorate or the approval of the Port Authority
 
ARTICLE 10 - (1 ) the building or renovations to the regional directorate of the documents submitted , or the Port Authority examined and approved within 15 working days . The applicant is given a copy of the approved documents . A copy of the Regional Directorate of the pop-up file is stored , or the Harbour Master .
 
Build and refurbishment tracking
ARTICLE 11 - ( 1) under no classification to build or refurbishment of the ship and water vehicles , build or refurbishment has been performed in accordance with the legislation in force , as often as deemed necessary by the authorized personnel of the administration , following the result of monitoring in the Annex to this Regulation on Appendix -7 Ship Follow-up Report Repair or water , or shall build tool . SIGNING periods of time to be determined by the administration to the control engineer is responsible for these controls . Checks referred to in this report build a new ship and water for at least 3 vehicles , water vehicles, ships and made ​​renovations done at least one time .
2) Classification of the ship and water vehicles built or renovated , built , or is followed by the classification society has been performed in accordance with the amendment .
3) After the date of entry into force of this regulation, with passenger capacity of 12 people at the ships and vessels built unclassified capacity increases are not permitted for a period of 5 years . This increases the capacity of the ship and water vehicles, allowing the ship to 5-year period shall be classified .
4) with a passenger capacity of more than 12 passenger ships and vessels not considered within the scope of capacity building renovations . In this case, the application for the new capacity expansion in the Annex to this Regulation on Annex ship carrying more than 12 passengers and 10 vehicles Passenger Capacity Increase Water project and the documents listed in the Regional Directorate of the documents required to apply for or include the Port Authority . The Administration account balance , the passengers and the seats reserved for the size of the area as a result of investigation conducted taking into account the criteria it deems appropriate determine the new capacity .
5) published in the Official Gazette No. 26390 dated 28/12/2006 and Recreational Craft Directive entered into force under the scope of this Regulation boats boats ; constructs , Annex - 3 of the Regulation on the ship or the project are listed in the documents required to apply for permission to build Water Tool and documents shall be sufficient to permit the build , construct controls required. Classed alteration or restoration, and the relevant provisions of this Regulation are considering to be unclassified .
 
PART THREE
Authority and Responsibility
The representative of the owner of the vehicle or vessel and responsibilities of water
ARTICLE 12 - ( 1) Ship and water vehicle owner or his representative or the modification stage of build ships and vessels ;
a) Ship and water crafts Administration the permission to start the build or Alteration ,
b) the appointment of the control engineer for the construction of ships and water crafts ,
c ) Vessel and water truck or a representative or in the event of change of control engineer built or renovated during the period of the Administration of information ,
d) Administration reported the project , build , or modifications made ​​outside the scope of the documents notifying the Administration , the Administration is responsible.
 
Establish the responsibilities of the owner or his representative
ARTICLE 13 - ( 1) the owner or representative of the ships and vessels built, renovated or bakımonarım stages ;
a) means for maintenance and repair of ships and the water contained in the appendix of this Regulation , Appendix 8 Ship or Water Vehicle Maintenance and Repair Information Form and inform the Regional Directorate or the Port Authority ,
b) or in free zones in the country , to be built or modified to do repairs or maintenance on foreign -flagged vessels and water utilities , the Appendix-9 in the country or in the Free Zones , construction or repairs to be modified or Foreign Flagged Vessel Maintenance and Water Tools Feedback Form regional Directorate or the Port Authority to provide information ,
c) The facility owner or its representative in case of change of built or renovated during the period of the Administration of information ,
d) The plant was built or renovated Administration the transactions taken not to let the necessary permits ,
d) vessel and the water truck to be built in place all the necessary safety measures in their respective areas , the Administration is responsible.
 
Powers and responsibilities of the control engineer
ARTICLE 14 - ( 1) The control engineer , build or refurbishment stage of ships and vessels ;
a) According to the project been built or modified ,
b) details of the implementation of prescribed material and workmanship ,
c) Payments under the supervision of an expert surveyor or project engineer will do a classy inclination to attend as an observer test ,
d) taking measures 'll demand that the administration ,
d) to perform periodic inspections foreseen by the administration to notify in advance the Administration ,
e) The project is located to the documents , which does not build or refurbishment of ships and watercraft owner or his representative being notified of the Administration and on behalf of the shipyard , the Administration is responsible.
 
2 ) Control Engineer , within the same period or up to a maximum total of 2000 GT'luk build tool and the amendment of five vessels and water as a control engineer has the authority to study .
 
SECTION FOUR
Miscellaneous and Final Provisions
Alteration of ships and watercraft decided
ARTICLE 15 - ( 1) the purpose of the facility maintenance / brought , but decided Alteration of the ship and watercraft shall be subject to this regulation, related alteration . The owner of the ship and the water tool , agent, or the change of the control engineer
ARTICLE 16 - ( 1) Ship and water vehicle owner , agent, or in the event of change of control engineer built or renovated during the period , the new owner of the ship and the water truck or a new representative of the regional directorate of the amendment or the Port Authority showing the Convention bearing allows .
 
certification
ARTICLE 17 - (1 ) the building or renovation by the end of the ship and the water vehicle owner or his representative , in the Annex to this Regulation on Appendix -7 Ship or water build tool or Repair Tracking Report, the submission of the final project , and the Port Authority or the Regional Directorate of measuring instruments , certification and registration transactions are initiated .
2) Classification of means of the ship and the water contained in the appendix of this Regulation , Appendix 7 Ship Repair Follow-up Report , or water , or asked to build a car . Or amendment shall be submitted to the document have been completed under the supervision of a classy build .
3) Recreational Craft Directive constructs within the scope of Appendix 7 ships or boats or water build tool Repair Follow-up Report is not required.
 
sanctions
ARTICLE 18 - ( 1) may be classed Turkish flag Turkish flag or vessels or unclassified , and water utilities to build or refurbishment of the administration stage of the inspections carried out by the authorized personnel of the legislation and plan , build , or modification of the document , and if it is determined without proper documentation , built or renovated according to the nature of the deficiency in order to conform immediately stopped and 15 is given a period of not less than the day . During this time, build or renovation will continue to ensure compliance with the case . If not provided , without a compelling reason, ship it and the availability of water , and after that vehicle is built or renovated revoked when applying the provisions of this article is the fourth and fifth paragraphs .
2 ) the building or renovation measurements made ​​as a result , legislation, plans , documents, and built or renovated without proper documentation had been made in the document be issued if it is determined .
3) by the Administration , the control engineer not fulfill its obligations under Article 14 of the Regulation on the control engineer warned in writing in case of detection and control engineer for a period of 1 year in case of repetition of the authorization will not be accepted by the Administration and bounded into the profession will be notified.
4 ) This regulation is within the scope of the relevant provisions, Pursuant to
a ) the building or renovation , or Amendment, which continues to build without permission ,
b ) the building or renovation or refurbishment completed built without permission ,
c) constructed or modified without the necessary controls are built or renovated ,
d) under the Recreational Craft Directive Recreational Craft Directive outside the scope of the boats built in the period , resulting in
d) Classification of the vessel and the water as a means of built or modified ships and vessels by reduced klastan the owner or his representative to the Administration , by the nature of the work contained in the annex of this Regulation , Annex -3 Documents Required Ship or water , or apply for permission to build a car in Annex 4 of the ship or water Tool Repair plans and accounts, together with the required documents to apply for permission to be requested upon application , be certified by way of surveys is based on the ship and the water truck .
5) From the date of entry into force of this Regulation , in accordance with the relevant provisions of the fourth paragraph of this article for undocumented vessels of applications made in accordance with the provisions of the necessary surveys in order to be added for the services is required to be deposited sum is determined by the Supervisor . Administration, surveys in addition to depending on the nature of the amount to be invested for the services determines .
6) According to provisions of this Regulation is to be done classed ships and vessels , made ​​in accordance with the provisions of the fourth paragraph of this article Applicants , the fifth paragraph of this Article, will be determined by the Supervisor for the services of the amount invested in the additional requirement of a classy addition to being searched.
 
Repealed Regulations
ARTICLE 19 - ( 1) published in the Official Gazette No. 25869 dated 08.07.2005 and Water Means of Ship Building, Renovation , Maintenance and Repair repealed Regulation on the Procedures and Principles .
 
vested interests
PROVISIONAL ARTICLE 1 - (1) before the date of entry into force of this regulation have been authorized to build or refurbishment or maintenance and repair of ships and water vehicles started in Turkey , published in the Official Gazette No. 25869 dated 07.08.2005 Means the construction of ship and water , Renovation , Maintenance and Repair already entered under the provisions of the Regulation on the Procedures and control engineer is not required to permit and valid documents .
 
force
ARTICLE 20 - ( 1) This Regulation shall enter into force on the date of publication .
 
Play
ARTICLE 21 - ( 1) The provisions of this Regulation, the Minister in charge of the Undersecretariat of Maritime Affairs
executed .

Gemi Sanayiciler Derneği 2013 Tüm Hakları Saklıdır.